Data & Analysis

VBF Comments on Draft Solar PPA

Data & Analysis

If the Draft Circular and the Draft PPA are not improved and the PPA template of the MOIT remains to be non-bankable, actual development and investment in solar power projects may be limited than expected or planned under the amended Power Development Plan VII, even though Vietnam remains to have a high potential for solar power investment.

DOWNLOAD

Draft Solar Power Purchase Agreement [VNE]

Data & Analysis

Draft of Standard Power Purchase Agreement for Solar PV projects in Vietnam

DOWNLOAD

Energy Pricing, Energy Supply and FDI Competitiveness in Viet Nam

Data & Analysis

An Assessment of Foreign Investor Sentiment

DOWNLOAD

Policy options to meet Vietnam’s renewable energy electricity generation targets

Data & Analysis

Analysis of renewable energy policies to support Vietnam’s Renewable Energy Action Plan.

DOWNLOAD

Pre-FS Summary: Project #6 – 110kWp

Data & Analysis

Pre-Feasibility Study Summary for a 110kWp rooftop solar PV system at a diary factory in Ho Chi Minh City.

DOWNLOAD

Pre-FS Summary: Project #5 – 65kWp

Data & Analysis

Pre-Feasibility Study Summary for a 65kWp rooftop solar PV system at an animal feed factory in Long An.

DOWNLOAD

Pre-FS Summary: Project #4 – 254kWp (phase 1)

Data & Analysis

Pre-Feasibility Study Summary for a 254kWp rooftop solar PV system (phase 1) at a garment factory in Ho Chi Minh City.

DOWNLOAD

Pre-FS Summary: Project #3 – 1,420kWp

Data & Analysis

Pre-Feasibility Study Summary for a 1,420kWp rooftop solar PV system at a garment factory in Dong Nai.

DOWNLOAD

Pre-FS Summary: Project #2 – 32.5kWp

Data & Analysis

Summary of the Pre-Feasibility Study for a 32.5kWp rooftop solar PV system at an office building in Ho Chi Minh City.

DOWNLOAD

Pre-FS Summary: Project #1 – 173kWp

Data & Analysis

Summary of the Pre-Feasibility Study for a 173kWp rooftop solar PV system at a food processing factory in Dong Nai.

DOWNLOAD